Family friendly. Very spacious and hold more than 13 people. Peaceful gateway | House in Port St. Lucie

New |   5 Bedrooms  3 Bathrooms  12 Guests
Port Saint Lucie House | Family friendly. Very spacious and hold more than 13 people. Peaceful gateway

5 Bedroom House in Port Saint Lucie, Port St. Lucie

Forget your worries in this spacious and serene space. Enjoy your trip in this home away from home! Fully equipped house with plenty of space for up to 13 people in beautiful Port St. Lucie. Our home has its very own elevator for your convenience!

Family friendly Very spacious and hold more than 13 people Peaceful gateway is located in Port Saint Lucie. Family friendly Very spacious and hold more than 13 people Peaceful gateway provides accommodation, featuring Air Conditioner, Security/Safety, Bedding/Linens, among other amenities. This House features Air Conditioner, Security and Bedding to make your stay a comfortable one.

Family friendly Very spacious and hold more than 13 people Peaceful gateway has 5 Bedrooms , 3 Bathrooms, and max occupancy of 12 people. The minimum rental for this property is 1 nights, but this can change depending on the season you plan on staying. Previous guests have given good rated it, and VRBO labeled it a top-rated House because of the excellent services rendered by the owner or manager of this House, and has consistently provided great experiences for their guests. Most families or guests that use it recommend it to their friends and some of them are repeat guests. House has a friendly neighborhood, and the Port Saint Lucie has interesting places to visit. If you want to learn more about the House in Port Saint Lucie, such as places to visit and things to do nearby, you can check below to learn more.

Show more
OneKey Logos

This Property is OneKey Eligible

Earn OneKeyCash for every dollar spent on eligible vacation rentals, villas, cottages, cabins, and more when you book on Vrbo.

JOIN TODAY

Amenities

Air Conditioner
Security/Safety
Bedding/Linens
Wellness Facilities
Child Friendly
Internet
Laundry

Facility Overview

Air Conditioner
  • Air conditioning
Bathrooms
  • 3 bathrooms
  • Bathtub or shower
  • Hair dryer
  • Shampoo
  • Soap
  • Toilet paper
  • Towels provided
Bedroom
  • 5 bedrooms
  • Bed sheets provided
Laundry
  • Near coin laundry
  • Washing machine and dryer
Pet Friendly
  • No pets allowed
Accessibility
  • Smoke-free property
Internet
  • WiFi available
Security/Safety
  • Carbon monoxide detector not reported (host has not indicated whether there is a carbon monoxide detector on the property; consider bringing a portable detector)
  • Smoke detector not reported (host has not indicated whether there is a smoke detector on the property)

Policies

Check-in
Check-in time starts at 4:00 pm minimum check-in age: 18
Check-out
Check-out before 11:00 am
Child Policy
Children are welcome.
Event Policy
Events allowed: family gatherings, birthday parties, weddings;maximum event attendees: 25
Pet Policy
Pets not allowed
Smoking Policy
Smoking is not permitted

Extra-person charges may apply and vary depending on property policy government-issued photo identification and a credit card, debit card, or cash deposit may be required at check-in for incidental charges host has not indicated whether there is a carbon monoxide detector on the property; consider bringing a portable detector with you on the trip host has not indicated whether there is a smoke detector on the property parties and events (including family gatherings, birthday parties and weddings) are allowed on site; maximum attendees: 25 special requests are subject to availability upon check-in and may incur additional charges; special requests cannot be guaranteed this property is managed through our partner, vrbo. you will receive an email from vrbo with a link to a vrbo account, where you can change or cancel your reservation

FAQ's

Is this Port Saint Lucie house pet-friendly for guests?

No, pets are not allowed at this property. Check the guest reviews to learn what guests had to share.

Does the Port Saint Lucie house have a swimming pool?

No, this Port Saint Lucie house does not have a swimming pool. Check the Facility Overview section for details about the pool and other available facilities.

How much does it cost per night to stay in Port Saint Lucie house?

Best-rates for the Port Saint Lucie house starts from $260 per night with includes Security/Safety, Bedding/Linens, Wellness Facilities, Child Friendly, Internet, Laundry, Air Conditioner with all other facilities. matches every traveler with their perfect accommodation, whether you are traveling with a group, friends, family, or pets.

Is Port Saint Lucie house a family-friendly place to stay?

Based on the information we have received from the owner or our partner, this is considered to be a family-friendly property. Families have rated this house Good or guests have recommended them suitable for families. As reported by the owner or manager, the house has specified that children are welcome. Please see details about suitability for your family or inquire with the property to learn more.

Is the Port Saint Lucie house wheelchair accessible or offer services for disabled guests?

Based on the information received from our partner, the Port Saint Lucie house has not specified they are wheelchair accessible. Likewise, there is not an elevator specified as being available at the property. Specific accessibility details may be addressed in the property details section of this page.

What is the minimum night stay policy for the Port Saint Lucie house?

Based on the information reported by the owner or manager, the Port Saint Lucie house indicates 1 day stay policy at this house. Guests are cautioned that the minimum stay policy may differ based on seasonality or availability and may be at the discretion of the owner or manager.

What cancellation policy is in place for Port Saint Lucie house?

Guests are cautioned that the cancellation policy may differ based on seasonality, availability, or current travel restrictions. Guests should also be aware that this policy may be subject to change and should be confirmed prior to booking. More details may be available on this page in the property description. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.

Check House Availability
Nightly rates from:
USD260
You will be redirected to  
Hot Deal - It has been viewed 14 times today
Not the right fit? Check out our other properties in Port Saint Lucie
Coastal Haven Retreat From US $691
         

|
New
Villa
  • Air Conditioner
  • Parking
  • Balcony/Terrace
Jenson Beach 4bd 2ba home with Heated Pool From US $294
         

|
10.0 (4 Reviews)
House
  • Air Conditioner
  • Parking
  • Pet Friendly
Little Piece Of Heaven, on the river From US $307
         

|
10.0 (3 Reviews)
House
  • Air Conditioner
  • Parking
  • Pool
Near Parks: Port St Lucie Home w/Private Pool! From US $505
         

Beach like you've never seen! Heated pool/spa! From US $472
         

Port ST Lucie River front home with private dock From US $187
         

Paradise Palms 2 From US $184
         

10.0 (38 Reviews)
House
  • Air Conditioner
  • Parking
  • Pet Friendly
PGA Golf & Mets Stadium Studio/Private PSL Retreat From US $119
         

10.0 (37 Reviews)
Apartment
  • Air Conditioner
  • Parking
  • Pet Friendly
Villa Domitiana From US $254
         

10.0 (29 Reviews)
House
  • Air Conditioner
  • Parking
  • Pet Friendly
Beautiful Port St Lucie Home w/Hot Tub! From US $280
         

Treasure Coast of FL with King Size Suite From US $201
         

Private Villa | Heated Pool + Hot Tub + Sleeps 20 From US $657
         

10.0 (21 Reviews)
House
  • Air Conditioner
  • Parking
  • Pet Friendly
Spacious PGA Golf & Mets Stadium Retreat From US $161
         

10.0 (20 Reviews)
Apartment
  • Air Conditioner
  • Parking
  • Pet Friendly